RECENT PROJECTS
Ryan Family Farm Project
- Date: Feb 2018
- Client: The Ryan Family
- Project Type: Construction of 2GL Dam
About this Project
The Ryan Family – father Tony and sons Glen and Dean and Glen’s son, Denver run a large mixed farm of livestock and potato production and more recently with diversification into lemons, avocados and kiwi fruit.
To ensure DROUGHT PROOFING of farm to sustain their operation a decision was made to lift an existing dam wall by 13 metres to increase capacity to approximately 2 GL. with a surface area of 25 ha’s and 2.1 km long.



The project involved:
Diversion and reconstruction of Grays road for 900 metres
Building a new wall –
• more than 300 m long
• 13 metres above original wall
• 24 m above bedrock
• 150 m thick at base
• 154,000 bank cubic metres of earth